Opening Update #3

Posted by on May 8, 2015

Thanks to SLRD, Area A Director Debbie Demare for this update and photos.

The Switchbacks have been spot graded.  Lillooet river FSR good condition.  Grader at summit had just started to work down Pembie side.
Summit to Face still some  snow covered ice with rutting.  Truck clearance, winter tires and 4wd required.  The huge hole by the bridge at Tenquille has been fixed.  Rough on Gold Bridge side.

Grader at Hurley summit

Grader at Hurley summit

Hurley Road

Hurley Road near the summit by the fire zone sign

 

2 Responses to Opening Update #3

  1. Graeme

    Awesome! Thanks for all these updates and the hard work!

    Going to be heading up to Gun Lake Sunday – Tuesday, can’t wait! :)

  2. Debbie Demare

    I came back tonight, Saturday n the grader has removed almost all of the snow ice. The road is open. Switchbacks in darned good shape, he is grading on our side but it is rough except where he has done it.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>